BEFORE-AFTER ROAD SPEED OF ONE WAY SYSTEM

  • Prima Juanita Romadhona Civil Engineering Department, Universitas Islam Indonesia
  • Asep Wahyu Hidayat Civil Engineering Department, Universitas Islam Indonesia
Keywords: One-way system, level of service, VISSIM

Abstract

The purpose of this study was to determine the road level of service based on average speed on Prawirotaman Street before and after implementation of one-way system traffic and the impact at surrounding roads (Parangtritis Street, Sisingamangaraja Street and Menukan Street). In this analysis, the researchers used a method of MKJI 1997 and VISSIM software to simulate in three dimensions. The average speed of Prawirotaman Street increased 15,72%, and the impact occurred on Singamangaraja Street is an improvement of 2,39%, as improvements for Menukan Street as much as 14,47% and an increase at Parangtritis Street is 11,02%.

Published
2018-05-23
How to Cite
Romadhona, P. and Hidayat, A. (2018) “BEFORE-AFTER ROAD SPEED OF ONE WAY SYSTEM”, Prosiding Forum Studi Transportasi antar Perguruan Tinggi. Available at: https://ojs.fstpt.info/index.php?journal=prosiding&page=article&op=view&path[]=17 (Accessed: 18October2018).